This scale project aimed at opening of new markets in the Asia-Pacific region, “Power of Siberia” will be a general gas- transport system to Irkutsk and Yakutsk (Chayanda field) gas production centers and will transport gas via Khabarovsk to Vladivostok. At the first stage there will be main gas pipeline “Yakutia- Khabarovsk- Vladivostok”, which is planned to be operational in 2017. The second stage is connection of Irkutsk gas pipe line center with Yakut center.
Technical characteristics of the pipeline: The length is about 4,000 km (Yakutia-Khabarovsk-Vladivostok-about 3200 km, Irkutsk Oblast (Irkutsk region)- Yakutia, about 800km)
Source: http://news.ykt.ru/article/24214 |